Introduction
Leader Aluminum Prop & Panel Slab Formwork System providing safe, reliable and high load bearing capacity, ample construction prop spacing, simple and ease operation, minimal labor, storage and transportation cost. The system is most cost effective and can be utilized together with unique Leader GN50 Modular Aluminum Prefabricated Facade Scaffolding System.
Main Features
1) Fewer prop usage, wider prop spacing.
2) Multi-directional connection available.
3) Long lifespan, lowest wear & tear.
4) Infinite extend usages & applications.
5) High efficiency, minimal labour involved for assembling & dismantling.
Detailed Images
Parts Name: Multi-direction ring connector
Multi-direction design, simple bracing easily for both outer inner tube of the prop enable stiff and robust structure with highest stability.
Parts Name: Prophead/Drophead/Prop Connector
Prop connector/Prophead/Drohead are made from steel, they enable stiff and stable connection between the shoring and the main beams.
Well developed design precast components for easy and simple connection ready by simple insertion latch location.
Parts Name: The Prop
*Four start collar screw
*Self cleaning threading
*Height indication tape
*Buil-in safe stopping device
*Powder coated outer tube
Parts Name: Aluminium main beams
Beams made by light weight, igh tensile robust aluminium alloy that enable high loading capacity, reducing the number of props required.
Prefabricated component, simple and easy to assemble.
Dimensions
Prop Model | AMP120 | AMP250 | AMP350 | AMP480 | AMP625 |
L min(mm) | 800 | 1450 | 1980 | 2600 | 4300 |
L max(mm) | 1200 | 2500 | 3500 | 4800 | 6250 |
Outer tube length (mm) | 715 | 1365 | 1865 | 2515 | 4211 |
Inner tube length (mm) | 421 | 1071 | 1571 | 2221 | 1975 |
Weight kg | 10.9 | 15.5 | 19.3 | 24.3 | 34.1 |
Min~Max Load KN | 70~90 | 60~70 | 42~88 | 25~85 | 20~56 |