Products Info
HOME> Tools & Hardware > Machining > CNC Plastic Processing Painted Machinery parts >
CNC Plastic Processing Painted Machinery parts

CNC Plastic Processing Painted Machinery parts

Technology:
3d printing, cnc machining, silicone molding, sticking, assembly
Material:
resin/plastic/silicone/metal
Quantity:
>1
Leading time:
15days
Technology:
3d printing, cnc machining, silicone molding, sticking, assembly
Material:
resin/plastic/silicone/metal
Quantity:
>1
Leading time:
15days
Supplier Info.
Registration Date: 2015
Country / Region: guangdong / China
City: guangzhou
Main Products: 3d printing companies, prototype making companies, custom plastic parts
Product Detail


Produsts: CNC Plastic Processing Painted Machinery parts

Specification

Raw material

ABS

Technology

vacuum casting

Tolerance

±0.1mm

File format

IGS,STP,X-T

Quantity

10 pcs

Lead time

5-7 work days

Surface treatment

polishing


Technological Process

1. Inspection, Programming

Our company use Proe and Rhinoceros software to deal with 3d drawing. Sometimes customers will use 3d max to make 3d drawing. As a result, when it transform into the stp or stl files, there will be broken facets, especially for those large data files. 

So when we receive the files, we need to check it to get detail information. If there is broken facet, our engineer needs to fix it. After that, we offer exact quotation to our customers.

When the order is done, our engineer will make programming according to the final drawing.



2. Machining processing

When the programming is settled down, we begin machining processing. CNC machining is a subtractive manufacturing process, where raw material is removed with a variety of precision cutting tools to make a part or product.



3. Manul post processing

After cnc machining is finished, we will go ahead to post processing. Generally speaking, polishing is the basic processing.

4. Painting

Sometimes, customers require painting. There are two kinds painitng, one is matte surface, the other is glossy surface. Matte surface takes around 4 to 5 work days. Glossy takes 5 to 7 work days. 


5. Finished goods

After painting is dry, we will get finished goods


   
undefined    
undefined    
undefined    
undefined    
undefined    
undefined    


Contact

Supplier

Contact us
Tell us your Buying Requirements