Products Info
HOME> Copper Heat Sink Lower Upper Body >
Copper Heat Sink Lower Upper Body

Copper Heat Sink Lower Upper Body

Port: :
china, guangzhou& foshan
Express By: :
dhl, fedex, tnt, ems express, by air and sea is available
Material: :
steel, iron, aluminum, carbon
Certificate::
iso9001:2008
Drawing: :
pdf, 3d, dwg, dxf, prt, igs, step, stp, iges, files are all accepted.
Brand: :
hg
Type: :
milling, drilling, cnc, pg, jg, grinding, edm, wedm
Capacity: :
per customized purchase quantity
Port: :
china, guangzhou& foshan
Express By: :
dhl, fedex, tnt, ems express, by air and sea is available
Material: :
steel, iron, aluminum, carbon
Certificate::
iso9001:2008
Drawing: :
pdf, 3d, dwg, dxf, prt, igs, step, stp, iges, files are all accepted.
Brand: :
hg
Type: :
milling, drilling, cnc, pg, jg, grinding, edm, wedm
Capacity: :
per customized purchase quantity
Supplier Info.
Company Name: HG Precision Components
Country / Region: / China
Main Products: precision mold parts supplier, punch& die manufacture, metal junction box die, sheet metal stamping parts, motor core die, fine blanking tooling
Product Detail



Progressive Die Description:

Full Automatic Tooling For Vechile Heatsink Lower/Upper Body

 

Heatsink Lower Body/Upper Material: H58

Heatsink Size: Lower 194.8x46x2mm; Upper 194x34x4mm;

Stamping Machine: 160T

Tooling Material: SKD-11; 45#, Cr12Mov, and so on.

Mold Schedule is 30-60days

Mold Usage Life: 10,000,000times.

Mold Length can make 3000mm maximum

Stamping Tooling SPM: 45-60 per min.

 

Copper stamping partsCopper stamping parts


Copper stamping parts

FAQ

Q1. What is your terms of packing?
A: Generally, we pack our goods in standard cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.

Q3. How about your delivery time?
A: Generally, it will take 15 to 45 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality/delivery time and competitive price to ensure our customer's benefit ;
    2. We respect every customer as our friend and we sincerely do business and make friends with them.


Contact

Supplier

Contact us
Tell us your Buying Requirements