Installation method | 1. Determining pitch-row, installing two crews on the wall, matching the product's back holes with the crews, hanging the product on the wall. 2. Pasting strong adhesive tape on the back of the product, keeping wall clean and dry, pressing the product on the wall firmly and adding liquid after 24 hours. |
Contact
Supplier