Products Info
HOME> Construction & Real Estate > Plastic Building Materials > Highly tensile stadium cover membrane structure building basketball court >
Highly tensile stadium cover membrane structure building basketball court

Highly tensile stadium cover membrane structure building basketball court

Completion Time:
september, 2015
Construction Site:
black gold plaza, changsha, hunan province
Brand:
yuehong
Project Area:
1500 square meters
Structure Selection:
main structure adopts q235 steel pipe
Warranty:
more than 15 years
Delivery Time:
within 25 days after confirm deposit
Film Type:
white pvdf architectural film imported from germany, total weight 1000g/㎡, thickness is 0.95mm
Payment:
t/t, visa, master card, e-checking, l/c, cash (30% deposit, 70% balance before delivery)
Place of Origin:
china guangzhou
Completion Time:
september, 2015
Construction Site:
black gold plaza, changsha, hunan province
Brand:
yuehong
Project Area:
1500 square meters
Structure Selection:
main structure adopts q235 steel pipe
Warranty:
more than 15 years
Delivery Time:
within 25 days after confirm deposit
Film Type:
white pvdf architectural film imported from germany, total weight 1000g/㎡, thickness is 0.95mm
Payment:
t/t, visa, master card, e-checking, l/c, cash (30% deposit, 70% balance before delivery)
Place of Origin:
china guangzhou
Supplier Info.
Registration Date: 1998
Country / Region: guangdong / China
City: guangzhou
Main Products: Tensile Membrane Structure,Tensile Membrane,Parking Shed Membrane Structure
Product Detail



Project Description
Membrane Structure


  •  

    Hainan Bangxi Golf Tee Membrane Structure Engineering Design and Construction General Contract Project Membrane Projection Area 1200 square meters.

  •  

    The project is based on on-site construction, from now to design and construction, and the duration is 15 days. This project uses a steel structure of the ceiling frame, the structure of the stretched film material above it, the lower support structure stability, because the roof is relatively simple in shape, the opening is not easily constrained, and high economic efficiency, widely used in any Large and small space is the most representative building in the area.

  •  

    This type of styling is suitable for swimming pool shade, golf tee, club head shade, tennis court and other door shade, simple and generous style, different styles.


Design Load & Material Parameter
Membrane Structure


  Design Load
  

Live Load: 0.30kn/m2;
Basic Snow Pressure: 0.00kn/m2;
Lifespan: 15 years.
Basic Air Pressure: 0.40 kn/m2;
Pre-tension of the Film Warp/weft=2.0/2.0 kn/m.


Material Parameter

 ◪ 1.The steel pipes used are all hot-pressed seamless steel pipes, all of which are made of Q235 and conform to GB700-88.

 ◪2.The pipe-to-pipe cross-links and pipe-to-connector connections may use butt welds or full-period fillet welds.

  3.All butt welds must be cut-through welds. These welds are not specifically graded as Class 3.

  4.The unwelded weld is a fillet weld with a weld not less than 4mm. All exposed openings have a sealing plate and a thickness of 4mm.

  5.The bolts are not shown in the figure as galvanized ordinary large hex head bolts, in line with GB5780-86; nut in line with GB41-86.

  6.Manual welding using E43xx welding rod, welding wire and flux used in automatic welding and semi-automatic welding shall ensure that the tensile strength of the deposited metal is not lower than that of the corresponding manual welding electrode.

  7.The film cloth is made of white PVDF film material.

 8.The material of the steel wire rope conforms to the universal wire rope standard "GB/T8918-1996". If this project is adopted, it is a hemp wire rope with a nominal tensile strength of 1570 and the surface is galvanized.


Hunan Black Gold Square Basketball Court - Side View
Hunan Black Gold Square Basketball Court - Elevation


Hunan Black Gold Square Basketball Court - Floor Plan
Hunan Black Gold Square Basketball Court - Axial View


Product Installation
Membrane Structure


                           
1
Installation-1
All welds are to be visually inspected and the visual inspection is grade B.
                           
2
Installation-2
The surface of all components must be rust-removed, grade is St3, coated with zinc-rich anti-rust epoxy primer, chlorinated rubber topcoat, the total thickness of paint dry film is not less than 130μm
                           
3
Installation-3
All steel components have sharp corners, burrs and flash edges. After the weld is welded, slag and spatter are removed.
                           
4
Installation-4
The ultra-long steel structural parts must be properly segmented at the factory during processing, transported to the site for assembly and welding, and required to be able to ensure that the strength of the assembled weld is stronger than the original steel components.
                           
5
Installation-5
Before the steel structure is installed and installed, it is necessary to check and measure the precision of the buried parts in advance.
                           
6
Installation-6
Arrange the installation sequence of the membrane structure of the steel structure rationally.



Contact

Supplier

Contact us
Tell us your Buying Requirements