Products Info
HOME> Construction & Real Estate > Plastic Building Materials > Large-Scale Comprehensive Industrial Warehouse Awning >
Large-Scale Comprehensive Industrial Warehouse Awning

Large-Scale Comprehensive Industrial Warehouse Awning

Completion Time:
october, 2017
Construction Site:
yangjing, guangdong province
Brand:
yuehong
Project Area:
3000 square meters
Structure Selection:
main structure adopts q235 steel pipe
Warranty:
more than 15 years
Delivery Time:
within 25 days after confirm deposit
Film Type:
white pvdf architectural film imported from germany, total weight 1000g/㎡, thickness is 0.95mm
Payment:
t/t, visa, master card, e-checking, l/c, cash (30% deposit, 70% balance before delivery)
Place of Origin:
china guangzhou
Completion Time:
october, 2017
Construction Site:
yangjing, guangdong province
Brand:
yuehong
Project Area:
3000 square meters
Structure Selection:
main structure adopts q235 steel pipe
Warranty:
more than 15 years
Delivery Time:
within 25 days after confirm deposit
Film Type:
white pvdf architectural film imported from germany, total weight 1000g/㎡, thickness is 0.95mm
Payment:
t/t, visa, master card, e-checking, l/c, cash (30% deposit, 70% balance before delivery)
Place of Origin:
china guangzhou
Supplier Info.
Registration Date: 1998
Country / Region: guangdong / China
City: guangzhou
Main Products: Tensile Membrane Structure,Tensile Membrane,Parking Shed Membrane Structure
Product Detail



Project Description
Membrane Structure


  •  

    The project site is located in Yangjiang. The head of the structure is made of a membrane structure. Because the project site is less than 50 meters away from the sea, the design of the structural support and shape are strictly in line with local conditions of use. Membrane fabrics are characterized by anti-corrosion, strong air permeability, sufficient light, and easy cleaning. The main structure is made of steel construction materials. The entrance is the use of sliding doors, each unit spacing is 15 meters. One of the advantages of this project is that the aircraft can freely enter and exit without lifting the wings.

  •  

    Such styling is suitable for awnings such as large-scale integrated gymnasiums, swimming pools, industrial warehouses, and commercial streets. The shape is simple and generous, with different styles.


Design Load & Material Parameter
Membrane Structure


  Design Load
  

Live Load: 0.30kn/m2;
Basic Snow Pressure: 0.30kn/m2;
Lifespan: 15 years.
Basic Air Pressure: 0.40 kn/m2;
Pre-tension of the Film Warp/weft=2.0/2.0 kn/m.


Material Parameter

 ◪ 1.All the steel pipes used are hot-pressed seamless steel pipes. All the main materials are Q235 steel, in line with GB700-88

 ◪2.The pipe-to-pipe connection and pipe-to-connector connection use a butt weld or full-period fillet weld.

  3.All butt welds must be cut-through welds. These welds are not specified and the weld grade is Grade 3.

  4.Where the weld is not a fillet weld, the weld foot is not less than 4mm. All exposed mouths have sealing plates.

  5.Bolts are galvanized common large hex head bolts, in line with GB5780-86; nuts in line with GB41-86.

  6.Manual welding uses E43xx electrodes, welding wires and fluxes for automatic and semi-automatic welding.

  7.Film fabric using white PVDF film with its total weight 850g/㎡.

 8.The wire rope material conforms to the universal wire rope standard "GB/T8918-1996".


Yangjiang hangar - side view
Yangjiang hangar - elevation
Yangjiang hangar - axonometric map


Product Installation
Membrane Structure


  •  

    Appearance inspections are performed on all weld locations. The visual inspection level is Class B.

  •  

    Rust removal is applied at the surface of all components and the rating is St3.

  •  

    All steel components are treated with sharp corners, burrs and flashes. After the weld is welded, the slag and spatter are removed.

  •  

    Super-long steel structural parts are processed in the factory according to the reasonable transport capacity segment, transported to the site assembly welding, and required to ensure that the strength of the assembled weld is stronger than the original steel components.

  •  

    Prior to installation and construction of steel structures, it is necessary to check and measure the precision of embedded parts in advance.

  •  

    Reasonably arrange the installation sequence of steel structure and membrane structure.



Contact

Supplier

Contact us
Tell us your Buying Requirements