Products Info
HOME> Tools & Hardware > Machining > Metal car parts with stamping >
Metal car parts with stamping

Metal car parts with stamping

MOQ:
1 piece
Payment:
50% when place order+50% before delivery
Delivery time:
4 weeeks also;
Material:
plastic-abs and wood;clay;foam
Color of material:
natural;white;black;
Surface treatment:
surface treatment:painting;slik screen;polish etc
MOQ:
1 piece
Payment:
50% when place order+50% before delivery
Delivery time:
4 weeeks also;
Material:
plastic-abs and wood;clay;foam
Color of material:
natural;white;black;
Surface treatment:
surface treatment:painting;slik screen;polish etc
Supplier Info.
Registration Date: 1998
Country / Region: guangdong / China
City: shenzhen
Main Products: custom 3d printing, cnc service, rapid manufacturing
Product Detail

At Industrial man,we can make different size of exhibition models,and the surface can be made varied according to different clients.Industrial man import this kind of machine since 2015,which consists of 5-axis advanced machining centers especially designed for shipyards specific needs. A wide range of models and cutting heads enable to meet any kind of dimensional and technological requirement. The shipyards who chose Belotti's Navy machining centres incremented their constructive quality and efficiency shortly; furthermore, the quality of working environment has greatly improved, thanks to the various accessories offered with the machining center, such as effective dust suction equipments and active/passive safety systems.

The following is a brief introduction to the modern mold production process.



   


◆ Data analysis:

Data analysis is done by engineering staff, including (material customization, mold design, tool design, etc.)
◆ Mold making, inspection tool making, stamping, bending forming(As shown in figure 1): 

Use professional equipment to process the sheet and other processes, and obtain the parts that match the data. The inspection tool is processed by CNC.
◆ Inspection tool 3D checking(As shown in figure 2): 

after the inspection tool is assembled, use three-coordinate detection to make the tolerance meet the welding requirements.
◆ Welding:

Use a gage for welding
◆ Three-coordinate detection: 

Three-coordinate detection of the tube beam after welding is completed
◆ Painting(As shown in figure 3):

Anti-rust spraying of the pipe beam to complete the pipe beam operation


Contact

Supplier

Contact us
Tell us your Buying Requirements