Products Info
HOME> Construction & Real Estate > Curtain Walls & Accessories > Metal Partition Wall For Hotel With Stainless Steel >
Metal Partition Wall For Hotel With Stainless Steel

Metal Partition Wall For Hotel With Stainless Steel

Brand:
keenhai
MOQ:
1sqm
Loading Port:
foshan,shenzhen
Trade Terms:
fob,cfr,cif,exw,ect
Delivery Term:
20-30 days,depends on the panel drawings and quantity
Payment Term:
t/t,30%deposit,balance settled before shipment
Lead Time:
15-30 working days
Brand:
keenhai
MOQ:
1sqm
Loading Port:
foshan,shenzhen
Trade Terms:
fob,cfr,cif,exw,ect
Delivery Term:
20-30 days,depends on the panel drawings and quantity
Payment Term:
t/t,30%deposit,balance settled before shipment
Lead Time:
15-30 working days
Supplier Info.
Registration Date: 2012
Country / Region: guangdong / China
City: foshan
Main Products: metal screen, facade cladding, metal ceiling
Product Detail


                   
Custom-made Service
                   
++
                   
Environmental Quality
                   
++
                   
Exquisite Craft
                   
++
    Strong Corrosion Resistance

    Stainless steel screen name is incredible, it has a more powerful anti-corrosion performance, in any harsh environment, stainless steel engineering can play its powerful performance, compared with the traditional iron engineering, it can effectively play, anti-corrosion, so that our consumers can better use.They last longer, they live longer.

                 
    Strong Anti-pressure Feature

    The biggest characteristic that archery steel material pledges screen adornment project still depends on, its fight pressure ability is powerful, compare with traditional woodiness material qualitative photograph, the density of stainless steel is smaller, this also raised its effectively fight pressure ability, let our consumer be in use process, can assume heavier article.

               


    Place an order please

    Contact

    Supplier

    Contact us
    Tell us your Buying Requirements