Products Info
HOME> Construction & Real Estate > Plastic Building Materials > New design tensile membrane structure for stadium roof >
New design tensile membrane structure for stadium roof

New design tensile membrane structure for stadium roof

Completion Time:
february, 2012
Construction Site:
guangzhou, guangdong province
Brand:
yuehong
Project Area:
2000 square meters
Structure Selection:
the main metal structure adopts q235 steel pipe
Warranty:
more than 30 years
Delivery Time:
within 25 days after confirm deposit
Film Type:
white pvdf architectural membrane imported from germany, total weight 1000g/㎡, thickness is 0.95mm
Payment:
t/t, visa, master card, e-checking, l/c, cash (30% deposit, 70% balance before delivery)
Place of Origin:
china guangzhou
Completion Time:
february, 2012
Construction Site:
guangzhou, guangdong province
Brand:
yuehong
Project Area:
2000 square meters
Structure Selection:
the main metal structure adopts q235 steel pipe
Warranty:
more than 30 years
Delivery Time:
within 25 days after confirm deposit
Film Type:
white pvdf architectural membrane imported from germany, total weight 1000g/㎡, thickness is 0.95mm
Payment:
t/t, visa, master card, e-checking, l/c, cash (30% deposit, 70% balance before delivery)
Place of Origin:
china guangzhou
Supplier Info.
Registration Date: 1998
Country / Region: guangdong / China
City: guangzhou
Main Products: Tensile Membrane Structure,Tensile Membrane,Parking Shed Membrane Structure
Product Detail



Project Description
Membrane Structure


  •  

    The project is based on the main steel structure as the main body, the cable structure is the force carrier, and the tensioned membrane unit is evenly loaded on the cable structure to ensure the stability and applicability of the structure. Using professional membrane structure software, the construction and installation simulation analysis calculations were performed at both local and whole levels, including detailed simulation analysis of the distribution and installation of typical structural units; and the overall structure of the shelter was divided into steps according to the construction tension sequence. The simulation of force analysis.

  •  

    The results of force analysis fully show that the structural roof fully utilizes the overall bearing capacity of the structural foundation, maximizes the effectiveness of the material mechanics, and has the characteristics of novel design, unique structure, attractive appearance, and magnificent appearance.

  •  

    This style is suitable for swimming pool shade, golf tee, club shade. The shade of the tennis court, the awning of the landscape, and other features provide simple and generous shapes and styles.


Material Parameter
Membrane Structure


  Parameters 
  

Project Area: 2000 square meters;
Structure Selection: The Main Metal Structure Adopts Q235 Steel Pipe;
The steel pipe is a high-frequency welded pipe, the material is Q235, and the welding rod is E43 type.
The membrane material uses PVDF architectural membrane material and the color is white.
The pre-embedded steel plate is Q235 steel.


Guangzhou Naval Academy Stadium - elevation
Guangzhou Naval Academy Stadium Map - Floor Plan
Guangzhou Naval Academy Course - Axis View


Product Installation
Membrane Structure


                           
1
Installation-1
The production of steel structures shall comply with the relevant provisions ofGB50205-2001.
                           
2
Installation-2
The grade of welding quality should reach Class III.
                           
3
Installation-3
Steel structure and anchorage foundation: The fabrication of the steel structure column meets the installation accuracy requirements and controls the dimensional error of the connector.
                           
4
Installation-4
The gusset plate thickness is 6m.
                           
5
Installation-5
All structural parts that have tapped holes or round holes need to be machined with a smooth, sharp angle.
                           
6
Installation-6
The end of the tube must not be exposed.
Reasonably arrange the installation sequence of steel structure and membrane structure.



Contact

Supplier

Contact us
Tell us your Buying Requirements