Products Info
HOME> Construction & Real Estate > Plastic Building Materials > PVDF/PTFE/ETFE stadium shade tent tensile membrane structure >
PVDF/PTFE/ETFE stadium shade tent tensile membrane structure

PVDF/PTFE/ETFE stadium shade tent tensile membrane structure

Completion Time:
july,2013
Construction Site:
dubai
Brand:
yuehong
Project Area:
1500 square meters
Structure Selection:
the main metal structure adopts q235 steel pipe
Warranty:
more than 15 years
Delivery Time:
within 25 days after confirm deposit
Film Type:
white pvdf architectural membrane imported from germany, 1000g/㎡, thickness is 0.95mm
Payment:
t/t, visa, master card, e-checking, l/c, cash (30% deposit, 70% balance before delivery)
Place of Origin:
china guangzhou
Completion Time:
july,2013
Construction Site:
dubai
Brand:
yuehong
Project Area:
1500 square meters
Structure Selection:
the main metal structure adopts q235 steel pipe
Warranty:
more than 15 years
Delivery Time:
within 25 days after confirm deposit
Film Type:
white pvdf architectural membrane imported from germany, 1000g/㎡, thickness is 0.95mm
Payment:
t/t, visa, master card, e-checking, l/c, cash (30% deposit, 70% balance before delivery)
Place of Origin:
china guangzhou
Supplier Info.
Registration Date: 1998
Country / Region: guangdong / China
City: guangzhou
Main Products: Tensile Membrane Structure,Tensile Membrane,Parking Shed Membrane Structure
Product Detail



Project Description
Membrane Structure


  •  

    This project adopts a double-cap inverted structure, which makes it possible to see the scenery on the playground without the influence of the weather. This makes the entire stadium even more graded.

  •  

    In addition, the light transmission performance of the membrane structure satisfies the lighting requirements of the stadium and effectively filters light, without affecting the viewing of sports events.

  •  

    This type of styling is suitable for awnings such as sports stands, sunshades, sports plazas, residential entrances, and commercial streets. The styling is simple and generous, and its styles are different.


Material Parameter
Membrane Structure


  Parameters 
  

Project Area: 1500 square meters;
Structure Selection: The Main Metal Structure Adopts Q235 Steel Pipe;
The steel pipe is a high-frequency welded pipe, the material is Q235, and the welding rod is E43 type.
The membrane material is PVC architectural membrane material, the color is white.
The pre-embedded steel plate is Q235 steel.


Dubai Stand Membrane Structure - Elevation
Dubai Stand Membrane Structure - Floor Plan
Dubai Stand Membrane Structure - Axis View


Product Installation
Membrane Structure


                           
1
Installation-1
Appearance inspections are performed on all weld locations. The visual inspection level is Class B.
                           
2
Installation-2
Rust removal is applied at the surface of all components and the rating is St3.
                           
3
Installation-3
All steel components are treated with sharp corners, burrs and flashes. After the weld is welded, the slag and spatter are removed.
                           
4
Installation-4
Super-long steel structural parts are processed in the factory according to the reasonable transport capacity segment, transported to the site assembly welding, and required to ensure that the strength of the assembled weld is stronger than the original steel components.
                           
5
Installation-5
Prior to installation and construction of steel structures, it is necessary to check and measure the precision of embedded parts in advance.
                           
6
Installation-6
Reasonably arrange the installation sequence of steel structure and membrane structure.



Contact

Supplier

Contact us
Tell us your Buying Requirements