Description for bathroom accessory set: | Unique Black Polyresin bathroom Household accessories set for Hotel icludes: 1-Tray 2-Soap dish 1 3-Soap dish 2 4-Cotton Jar 5-Tissue cover 6-Waste bin
|
Type: | Unique Black Polyresin bathroom Household accessories set for Hotel |
Style Number: | XY-0027 |
Size for polyresin bathroom accessory set: | Tray 23.00x10.00x3.0CM |
Soap dish1 14.00X10.00X3.00 | |
Soap dish2 10.00X10.00X2.00 | |
Cotton Jar 13.00X13.00X10.00 | |
Tissue cover 13.50x13.50x13.00CM | |
Waste bin 18.00X18.00X23.00 | |
Usage: | Bathroom accessories set for hotel or home decoration |
MOQ: | 200pcs |
Sample time: | 10-15days |
Production lead time | 45-55days |
XuYing was really factory of making bathroom accessories set.
It was opened in 2008,and factory area of 10,000 square maters,more than 300 workers include senior Management.
It has been integration services such as designing,developing,making.Our Strong R&D team are capable of creating new designs each month.
XuYing has been insisting on the principle of HIGH QUALITY and WELL CUSTOMER SERVICE.The materials are new fresh eco-friendly which meets SGS,REACH,EN71,etc too more regulations.
XuYing is committed to develop and produce excellent bathroom accessories used with more materials.
-Resin Bathroom Set
-Ceramic Bathroom Set
-Cement Bathroom Set
-Metal Bathroom Set
Q1:How can I get the production&price informations?
A1:Please contact us in email, then we will send the information which you need to you.
Q2:How long does it take to receive the sample?
A2:It depend on the complexity of your items. If we have mould, the time to make the sample is about 7 working days. If not, the longest will be 20days including design, sculpture confirmation time.
Q3:Does your company do the retail business?
A3:We are manufacturer, not retailer. We specialize in B2B.
Q4:What’s the minimum order?
A4:MOQ is 200 pcs/sets normally, and could be 100pcs depends on the items ruuning on production line or not.
Q5:How the cargoes?
A5: Which depends on customer request.Normally, for bigh volumn, we suggest to ship by sea,for small volumn, can be shipped by courier/express etc.
Q6:How long does it take to receive the goods?
A6: Mass production lead time is 45-50days after deposit received.The time for customer can get the goods depends on where you are.
Contact
Supplier