Products Info
DB50 Tube mill

DB50 Tube mill

Brand::
dbkj
Payment::
tt, l/c
Start Port::
shanghai, china.
Delivery time::
60-90days
Warranty: :
1years
Customization::
according to customer requirement.
Brand::
dbkj
Payment::
tt, l/c
Start Port::
shanghai, china.
Delivery time::
60-90days
Warranty: :
1years
Customization::
according to customer requirement.
Supplier Info.
Registration Date: 2010
Country / Region: jiangsu / China
City: wuxi
Main Products: roll forming machine,slitting line machine,cut to length line machine
Product Detail

DB50 High Frequency Welded Tube Mill Line

Short Description

This welded machine line is specially used for producingΦ19-Φ76mm, 0.6-3.25mm high-frequency straight seam welded pipe and corresponding square pipe and special-shaped pipe(δ≤3.5mm). The composition of equipment is from uncoiler to fixed length cutting saw. Rolling speed can be adjusted correspondingly within suitable range of pipe diameter and wall thickness.

Working Flow

Slit Coil — Un-Coiler — Shearing And Butter Welder — Storage/ Accumulator — Forming — Welding — Cooling — Sizing — Cutting Saw — Run Out Table — Finishing — Pipe Collecting and Packaging

 

Product Parameters

1.Pipe O.D(round): 19-76mm

2.Square pipe: 12-80mm

3.Thickness: 0.5-3.25mm

4.Length: 4-12m

5.Speed: 20-100m/min

6.Main motor: 80KW

7.H.F welder: 150Kw

Machine Components

1. Decoiler

2. Shear and butter welder

3. Accumulator

4. Straighener

5. Forming machine

6. Welder and cleaner

7. Cooler

8. Size mill

9. Flying saw cutter

10.Run out table

11.Pneumatic system

12.Electrical control

Machine Picture

Package&Delivery 

We will book cabins before delivery, and arrange land transportation before customs declaration. After all the parts were packed into the container, we repaired all parts of the machine and reminded the driver to pay attention to safety and our salespeople will always pay attention to logistics.

Customers visit

Recommendation

FAQ

1. Q: What's the warranty period? 24hours online

12 months warranty period, starting from the date of the successful installation and commissioning of the equipment at the Buyer’s Installation site. During which all parts damaged because of quality problem will be changed for free.

2. Q: Do you have installation and commissioning service?

A.If buyers come to our factory to inspect, the training to install and operate is provided face to face. If not, manual and video is provided to show how to install and operate.

B. If buyer need we will send technician to buyer site to do installation and commissioning and training.

C.installation and commissioning cost: One engineer will visit Buyer’s workshop for installing, commission and training. The buyer has to pay USD100/per day and visa fee, air tickets fee, accommodation and food, necessary communication, etc.

(Normally ,It takes about a week to install )

3. Q: What’s your after-sales service

We provide 24-hour online service for our customers.

And we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed. 

4. Q: What's your delivery time

Normally we can finish production and testing within 45-70 days after receiving deposit. Some machines in stock, can be delivered at any time

5. Q: You are trading company or factory?

We are Manufacturer, and we export our machine by ourselves. 

6. Q: Do you provide customized machine

Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients. 

7. Q: How to visit your factory? 

We are in jiangyin city,belongs to Jiangsu province, 

near Shanghai. If you arrive at Shanghai Airport,we can pick you up

It is 160 kilometers from Pudong Airport, about 3 hours.

It's 110 kilometers from Hongqiao airport, about 2 hours; It's 125 kilometers from downtown Shanghai about two and a half hours.

It is very convenient.Please let me know if you have booked the tickets 

so that I can prepare and book a hotel for youwe will arrange for car to pick you up. 

By high speed train from Shanghai to East Wuxi (Wuxi Dong station), half an hour. 

8. Q: How to place order

Inquiry---confirm the profile drawings and technical specification and price----confirm the PI---arrange the deposit or L/C---start production-- do inspection--- Shipment

9. What are your terms of payment ?

First payment: 30 % by T/T, second payment: 70% by T/T, after the successful inspection at seller’s workshop, and before delivery.



 


Contact

Supplier

Contact us
Tell us your Buying Requirements