Products Info
HOME> Tools & Hardware > Machining > Precision mold for eyeglass of helmet >
Precision mold for eyeglass of helmet

Precision mold for eyeglass of helmet

Product Name:
eyeglass rl001
Mold number:
zg18086
Material thickness:
2.2mm
Product material:
pc
Product size:
215*205*92
Mold weight:
545 kg
Mold size:
500*450*306
Applicable injection molding machine tonnage:
400t
First trial mold cycle:
42 days
Product Name:
eyeglass rl001
Mold number:
zg18086
Material thickness:
2.2mm
Product material:
pc
Product size:
215*205*92
Mold weight:
545 kg
Mold size:
500*450*306
Applicable injection molding machine tonnage:
400t
First trial mold cycle:
42 days
Supplier Info.
Registration Date: 2007
Country / Region: guangdong / China
City: foshan
Main Products: plastic injection molding,plastic mould,chinamouldmanufacturer
Product Detail


Precision mold for eyeglass of helmet
The product is made of ABS material, durable, strong resistance, non-toxic and harmless to human body.
(1)Our company has been engaged in the production of helmet molds for many years, and is competent in the design and manufacture of various helmet molds.
(2)We have rich experience in manufacturing helmet molds. Besides, our company understands the assembly and adjustment of various helmet structures, and can provide customers with clear suggestions and modification suggestions, which can help customers to achieve the desired product.
(3)Our company has its own research and development team, can develop a new type of helmet die structure. (4) Our company provides post-maintenance, during the maintenance period, we will help solve any problems free of charge.  


Parameter
ZHUANGAO

Material

ABS

Features

Durable, Strong Fighting AbilityNon-toxic, light in quality and affordable in price

Shell dimensions

365*260*280

Product Safety

It has a strong protective effect on human body in the event of accidents.

Product characteristics

wide applicability, strong protection

Product type

(1)The main body of the helmet--the shell
(2) all the plastic parts of the helmet
(3) the software strip in the helmet
(4)the lens of the helmet.




This is our design drawing of the die for the helmet. The way of pushing out the cylinder of the slider on both sides and the internal slider is adopted to make the product come out smoothly.
This is the physical drawing of the die for the helmet  shell, which is the main core part.



This is the opening drawing of the helmet mould. When the slider on both sides opens the mould and the slider is ejected, the product can be taken out.
Our company make all kinds of moulds for the whole series of helmet accessories, including the main body of the helmet, as well as various accessories of the helmet.
Customer Protection
ZHUANGAO

        Our company can undertake R&D-design-manufacture of helmet products, the whole manufacturing process, professional team responsibility and communication, can guarantee the quality of products, and can provide customers with the most practical and pertinent opinions, ensure the delivery and quality of moulds, adhere to the principle of customer first, including later maintenance is also omni-directional, and strive to make customers have the most satisfactory experience.


FACTORY DISPLAY
ZHUANGAO



The company has been committed to improving the precision of machining process. Under the guidance of the strong R&D department, the company has developed strictly technical solutions and inspection standards for various processing links, and actively introduced advanced management software. At present, all the quality and progress parts of the company are under the close supervision of management software, the company can always maintain high quality molds while operating efficiently.



CERTIFICATE DISPLAY
ZHUANGAO


The company has fully implemented the modern production model and management system in management and has passed ISO9001 :2008 / ISO14001 :2004 / TS 16949 international system certification.




SIX CORE ADVANTAGES
ZHUANGAO


  • 01

    The "Project Manager" system guarantees the product that meets your requirements

    As long as the final intention of your product can be fully expressed, our project manager can lead a complete technical group meeting to review, demonstrate and dig out various assembly details, there may be problems about the mold opening, about the injection molding and about the post-testing ......
  • 02

    The full argument before the mold-opening guarantees that the mold made meets all aspects of your needs

    As long as your relevant departments can cooperate with us to complete all the processes, the product may have problems with detection and preparation, mold-related information (mold size, injection cycle, injection difficulties, product weight, nozzle weight, pickup method, the cooperation of the robot Requirements, etc.), T0 (first tryout) time, estimated delivery time, etc. are all within your precise control.
  • 03

    Do not worry

    Zhuangao mold strictly controls the time, ensuring that the T0 (first test) sample of the mold will arrive at your development department as scheduled.      After a long period of exploration and painful reform, the high-level molds control the efficiency and progress of the mold and reach the top level in the industry.
  • 04

    We never talked to you about the “quality” and the customers that had cooperated with the special high molds. We basically did not discuss the “quality” issues with Zhuangao mold  because the “mold quality” and “product quality” of the special molds are exempted from inspections!

    For the CNC machining accuracy, the "machine age" of the CNC of the high-profile mold will not exceed 2 years. We will install the three-coordinate test on the CNC to achieve "no detection, no machine".
  • 05

    The shortest delivery cycle, help your new product development cycle to win peers

    We really do try to test the mold less than twice
  • 06

    The price is the real secret of our winning your heart!

    We have always been committed to reviewing our internal waste, experimenting with optimizing all technical solutions, and ensuring that our molds are “exempted from inspection” while minimizing costs and saving much more than the cost of their peers. Above all, we have already shared with our customers!



CUSTOMIZATION SERVICE
ZHUANGAO


1
1
Sign the mold contract
1
1
Product Drawings Review
1
1
Mold drawing design
1
1
Precision manufacturing and processing
1
1
Size monitoring
1
1
Mold assembly
1
1
Die trial production
1
1
Die acceptance
1
1
Mold mass production
1
1
After-Sales service




Contact

Supplier

Contact us
Tell us your Buying Requirements