Sports tent roof cover canopy tensile white membrane q235 steel structure canopy

Sports tent roof cover canopy tensile white membrane q235 steel structure canopy

Completion Time:
march, 2014
Construction Site:
bangxi, hainan
Brand:
yuehong
Project Area:
1200 square meters
Structure Selection:
main structure adopts q235 steel pipe
Warranty:
more than 15 years
Delivery Time:
within 25 days after confirm deposit
Film Type:
white pvdf architectural film imported from germany, total weight 1000g/m2, thickness is 0.95mm
Payment:
t/t, visa, master card, e-checking, l/c, cash (30% deposit, 70% balance before delivery)
Place of Origin:
china guangzhou
Completion Time:
march, 2014
Construction Site:
bangxi, hainan
Brand:
yuehong
Project Area:
1200 square meters
Structure Selection:
main structure adopts q235 steel pipe
Warranty:
more than 15 years
Delivery Time:
within 25 days after confirm deposit
Film Type:
white pvdf architectural film imported from germany, total weight 1000g/m2, thickness is 0.95mm
Payment:
t/t, visa, master card, e-checking, l/c, cash (30% deposit, 70% balance before delivery)
Place of Origin:
china guangzhou
Supplier Info.
Registration Date: 1998
Country / Region: guangdong / China
City: guangzhou
Main Products: Tensile Membrane Structure,Tensile Membrane,Parking Shed Membrane Structure
Product Detail



Project Description
Membrane Structure


  •  

    Hainan Bangxi Golf Tee Membrane Structure Engineering Design and Construction General Contract Project Membrane Projection Area 1200 square meters.

  •  

    The project is based on on-site construction, from now to design and construction, and the duration is 15 days. This project uses a steel structure of the ceiling frame, the structure of the stretched film material above it, the lower support structure stability, because the roof is relatively simple in shape, the opening is not easily constrained, and high economic efficiency, widely used in any Large and small space is the most representative building in the area.

  •  

    This type of styling is suitable for swimming pool shade, golf tee, club head shade, tennis court and other door shade, simple and generous style, different styles.


Design Load & Material Parameter
Membrane Structure


  Design Load
  

Live Load: 0.30kn/m2;
Basic Snow Pressure: 0.00kn/m2;
Lifespan: 10 years.
Basic Air Pressure: 0.60 kn/m2;
Pre-tension of the Film Warp/weft=2.0/2.0 kn/m.


Material Parameter

 ◪ 1.All the steel pipes used are high-frequency welded pipes, and all the components are made of Q235, which conforms to GB700-8.

 ◪2.The tube-to-tube connection and the connection between the tube and the connector may use a butt weld or a full circumferential fillet weld.

  3.All butt-welded joints shall be welded through a cut-out, and such welds shall not be specifically graded as Class III.

  4.The non-injected girth welds are fillet welds with a weld foot of not less than 4mm and all exposed seams have a sealing plate.

  5.Special said bolts are galvanized ordinary large hex head bolts, in line with GB5780-86; nuts in line with GB41-86. Manual welding using E43X electrode.

  6.The membrane fabric is made of PVC membrane material (PVDF coating on the surface). The material of the steel wire rope conforms to the universal wire rope standard "GB/T8918-1996". This project is a ramie wire rope with a nominal tensile strength of 1570 MPa and the surface is galvanized.


Golf tee - side view
Golf tee - floor plan
Golf tee - Axon


Product Installation
Membrane Structure


                           
1
Installation-1
All welds are to be visually inspected and the visual inspection is grade B.
                           
2
Installation-2
The surface of all components must be rust-free, coated with anti-embroidered epoxy antimony primer.
                           
3
Installation-3
All the steel parts go to sharp corners, burrs and flash, after the weld is welded to the slag, spatter.
                           
4
Installation-4
Super-long steel structural parts are processed in the factory according to the reasonable transport capacity segment, shipped to the site assembly welding,And it is required to ensure that the strength of the assembled weld seam is stronger than the original steel components.
                           
5
Installation-5
Before the steel structure is installed and installed, it is necessary to check and measure the buried precision of the embedded parts in advance.
                           
6
Installation-6
Reasonably arrange the installation sequence of steel structure and membrane structure.